Construction of 48 foundations in reinforced concrete cast on site, of circular type for the installation of wind blades of overall power exceeding 110,000,000 Watt. The works were executed and arranged for the installation of stackable pre-fabricated rings and subject to a post-tension process carried out from within the foundations.

Site

Isola di Capo Rizzuto (KR)

Timing

Settembre 2008 – Ottobre 2009

Client

Enercon GmbH